LEADER evaporator - Leader in Maple Sugaring Industry since 1888

About Us|Home
Catalog Request or Contact Us

. My Account.Login

 
 

Forced Draft Unit

Previous  Up  Next" 

 Download PDF Instructions Manual

INSTALLATION OF FORCED DRAFT UNIT

 

A. Install piece of 18 gauge galvanized into the bottom of ash pit.

B. Bolt piece of 2" x 2" x ¼" angle iron 9" to center from arch front to 3" band iron (grate rail). Use 3/8" x 1 ½" machine bolts. (If installing air tight front, measure your 9" from 2" box tubing around door opening).

C. Bolt second piece of 2" x 2" x ¼" angel iron 39" to center of angle iron from arch front. Bolt to 3" band iron (grate rail). Use 3/8" x 1 ½" machine bolts.

D. Cut hole in sheet metal in existing ash back. Install sheet sleeve or sleeves and blowers in ash back with 3/16" x 1" machine screws. It is recommended to use a caulking compound behind sheet metal sleeve to prevent blow out.

Units 4’ wide and less receive only one sleeve and blower.


SKU:
Price: $0.00 
 

Add to CartAdd to Wishlist